Office building Torenhove in Delft

MarketProjects,
Extent22 floors, 22.000m²
ClientVan der Vorm Vastgoed
Consultancy firmE&B Engineering en bouwbegeleiding
InstallerBokhorst Installatie Groep B.V.
Date of completion2012 -2013

Office building Torenhove in Delft

Existing construction Torenhove

Many office buildings were built according to the then-valid standard for indoor climate, but it is important to conform to the current standards. It is difficult to install a system of ventilation shafts in an existing building with low ceilings. That is why the client of this project chose for a fitting solution: the ClimaRad Comfort Solution. Because the air is supplied and extracted directly via the façade, no extra channels are needed.

Our solution

We have installed the ClimaRad Comfort Solution in every room on six floors of the Torenhove. The HRV units ensure optimal ventilation in this office building. The ventilation was seriously sub-par in the former situation, but because of our solution of installing a cooling ceiling employees can work in much more comfort. Because of the smart application of ClimaRad, the offices can also be partitioned freely in the future. The ClimaRad automatically adapts if the indoor air quality of a room changes. The ClimaRad Comfort Solution is also individually adjustable.

© Copyright 2017 ClimaRad B.V. Privacy Statement | SitemapContact | Disclaimer | Algemene voorwaarden